New arrivals

05/10/2024   Rare eart...
05/09/2024   6/19-20 M...
05/08/2024   March 202...
05/06/2024   Mar2024 B...
05/02/2024   6月19日‐20日...
05/02/2024   6月19日‐20日...
04/30/2024   6月19日‐20日...
04/26/2024   Rare eart...
04/24/2024   6月19日‐20日...
04/16/2024   Analysis ...
04/16/2024   Interview...
04/15/2024   Analysis ...
04/09/2024   Rare Eart...
04/09/2024   The Roadm...
03/22/2024   Rare eart...
03/20/2024   2024 REIA...
03/15/2024   Memorandu...
03/15/2024   Memorandu...
03/15/2024   The 3rd C...
03/15/2024   Analysis ...

Tellurian Files Application for New Pipeline Project to Serve Southwest Louisiana

Tellurian Inc. recently announced that its wholly owned subsidiary Driftwood Pipeline LLC has submitted a formal application with the Federal Energy Regulatory Commission (FERC) to construct and operate Line 200 and 300, an approximately 37-mile, dual 42-inch diameter interstate pipeline that will originate near Ragley in Beauregard Parish, Louisiana and end near Carlyss in Calcasieu Parish, Louisiana.
This article is for members only. You can read the rest after application confirmation.

Register now Login

Related articles

Read more related articles...