New arrivals

06/10/2024   Rare Eart...
06/08/2024   !残席僅か!6/1...
06/07/2024   Analysis ...
06/06/2024   Analysis ...
06/06/2024   Rare Eart...
05/24/2024   Analysis ...
05/24/2024   Statistic...
05/24/2024   Analysis ...
05/24/2024   Copper Sc...
05/24/2024   Lead batt...
05/24/2024   2024 Copp...
05/24/2024   Aluminum ...
05/22/2024   SUSscrap ...
05/22/2024   Fe Scrap ...
05/22/2024   Rare eart...
05/21/2024   6月19日‐20日...
05/10/2024   Rare eart...
05/08/2024   March 202...
05/06/2024   Mar2024 B...
05/02/2024   6月19日‐20日...

Rystad Energy-Onshore Pipeline Project Costs are Set to Increase by 4%~6% Globally by the End of 2022

The costs associated with onshore pipeline projects are likely to increase by between 4% and 6% globally by the end of 2022 against current levels, a Rystad Energy analysis reveals, as prices continue to surge for labour, raw materials and transportation.
This article is for members only. You can read the rest after application confirmation.

Register now Login

Related articles

Read more related articles...