New arrivals

05/02/2024   6月19日‐20日...
05/02/2024   6月19日‐20日...
04/30/2024   6月19日‐20日...
04/26/2024   Rare eart...
04/25/2024   6/19-20 M...
04/24/2024   6月19日‐20日...
04/16/2024   Analysis ...
04/16/2024   Interview...
04/15/2024   Analysis ...
04/09/2024   Rare Eart...
04/09/2024   The Roadm...
03/22/2024   Rare eart...
03/20/2024   2024 REIA...
03/15/2024   Memorandu...
03/15/2024   Memorandu...
03/15/2024   The 3rd C...
03/15/2024   Analysis ...
03/14/2024   Analysis ...
03/13/2024   Hirata Co...
03/12/2024   Tantalum ...

Rystad Energy-Onshore Pipeline Project Costs are Set to Increase by 4%~6% Globally by the End of 2022

The costs associated with onshore pipeline projects are likely to increase by between 4% and 6% globally by the end of 2022 against current levels, a Rystad Energy analysis reveals, as prices continue to surge for labour, raw materials and transportation.
This article is for members only. You can read the rest after application confirmation.

Register now Login

Related articles

Read more related articles...